VEICHI AC100 — 3 INSTALLATION AND WIRING

AC100 HIGH-PERFORMANCE VC INVERTER MANUAL INSTALLATION AND WIRING 3.2 Dealing Methods for Inverter after Long-term Storage If the inverter storage time is over one year, the aluminum capacitor in the inverter must be pre-charged again and make sure the aluminum capacitor characteristic recovered before installation. For specific method, please follow the grads in the chart below and give more than 30 mins corresponding proportional voltage for every grad when the inverter is no-load.

If the input voltage of one grad is at the critical point of contactor, fan or other equipments, please increase or reduce the corresponding input voltage for the grad to avoid any related components working under critical state. Chart 3-1: Dealing Methods for Inverter after Long-term Storage 3.3 Stable Running Environment for Inverter Installation environment is very important to maximize the performance of this product and maintain long-term function, so please install the product in the environment as required in the following chart.

Chart 3-1:AC100 Series Inverter Running Environment Condition 11 Environment Requirement Installation site Indoor without direct sunshine Operating -10 ~ +40℃(hanging type) -10 ~ +45℃(cabinet type) temperature Storage temperature -20 ~ +60℃ Environment humidity Surroundings Please install the inverter in place as follows: ● Place without oil mist, corrosive gases, flammable gas, dust, etc. ● Place where metal dust, oil, water would not get inside the inverter (please do not install inverter on flammable material such as wood, etc). ● Place without radioactive material or flammable material. ● Place without poisonous gases or liquid. ● Place with little salt corrosion.

● Place without direct sunshine. Altitude Vibration Installation and cooling ● Inverter must be installed vertically and longitudinally, and it can’t be installed horizontally. ● Please independently install high heating equipments such as braking resistor and it can’t be installed in the same cabinet with inverter. Installation of high heating equipments at the air-in port of the inverter is strictly prohibited.