& WARNING: Failure to follow these safety precautions may lead to a serious accident. — CHECKS BEFORE STARTING Carry out the following checks 7. PRECAUTIONS DURING OPERATION ENGINE before starting the engine at the beginning of the days work. Failure to carry out these checks may lead to serious injury or damage. Walk-around checks — See “12.1.1 WALK-AROUND CHECK”. Checks before starting —~ See “12.1.2 CHECK BEFORE STARTING”. Operations and checks before starting engine — See “12.1.3 OPERATIONS AND CHECKS BEFORE STARTING ENGINE”. During maintenanace, attach warning tag to the instrument panel, and put up notice near the generator.
Do not allow unauthorized ELECTRIC SHOCK FROM e If the method persons to come near the generator. ELECTRICAL LEAKAGE for grounding is not correct, the machine will not be effectively protected from electrical leakage, and this may lead to electric shock. Always carry out grounding individually for the electrical leakage relay contact terminals, outside box contact terminal, and outside box of load equipment. e Check the action of the electrical leakage relay by pressing operations. the test button when starting