Kaiyi D375A-6 — Preface

Preface Since this machine is large in size, it is divided into some units to meet the transportation conditions and regulations applied to the transporta- tion route when shipped from our factory. This manual describes how to assemble the units into the complete machine in the field. We hope that this machine will display its quality and you will use it safely according to the operation manual. Many units are large in size and heavy in weight and may be handled in a dangerous place or posture and many workers may have to work together to sling them with cranes.

Accordingly, before starting the assembly work, the work supervisor is required to hold a safety meeting to oblige the workers to put on pro- tective gear and appoint a work leader and a crane work signal man and allot roles to all the workers for safe work. In particular, the above meeting is more important when worker of dif- ferent languages and customs work together. The following is a reference supervision system diagram. (Instruction system) Work leader Crane director Director and deputy director Operator for assembly Interpreter Mechanics Sharing of work When the work equipment is installed, the engine must be operated.

Accordingly, before installing the work equipment, inspect and main- tain the machine thoroughly. Note that this manual does not describe the whole specification of the machine but describes only the basic specification. Work supervisor Liaison man