KOMATSU LTD. — ASSEMBLY

ASSEMBLY 10) Check protrusion of bushing and pin from link with depth gauge. (L4, L5) # It should be done on both side on the first three(3) set of Links at least. Protrusion of bushing and pin on the both side should be in the specification. And it should be even on both side. Otherwise, edge ring might not be fit in the groove on the pin properly. Bushing Pin 11) Check shoe bolt pitch with shoe bolt pitch gauge. (L6, L7 & L8) After that check link rotation manually. - 23 - 12) Wedge ring installation Set wedge ring on ring installation tool. (R7 & R8) # The open end of ring should be Ring set at center of three split tool.

The ring may not be inserted pin groove properly in case the open end of ring is not at center of tool as shown in the drawing on the left. Tool # The open end of ring should be set at center of three split tool. The ring may not be inserted pin groove properly in case the open end of ring is not at center of tool as shown in the drawing on the left.