KOMATSU LTD. — KEY POINTS AT WET TURN

KEY POINTS AT WET TURN 1) With this method of turning, the pin and bushing are turned and reassembled and the assembly is filled with oil. Be careful to assemble the pin so that the side hole (branch hole) is on the link tread side in the same way as before turning. 2) Not only a bushing but also a seal need to be replaced with new one at the same time when a bushing is replaced with new one. On the other hand, a bushing can be reused if there is no abnormality even if a seal is changed with new one. And bushings and seals are not reuired to assemble as original set.

OK NG Bushing to be reused New seal Seal to be reused New bushing Sealing surface is formed in these positions In the initial period of use, this portion contacts so it does not make a seal 3) Pin will not be held enough and it would be come out if it is not assembled properly at bushing turn, and it will cause oil leakage by the sealing mechanism mentioned in the former page. Therefore, it is necessary to control dimensions strictly and assemble in proper steps. All parts must free from damage during assembling time, especially bushing end face. 4) Refer separate volume of shop manual "Guidance for Reusable parts-Lubricated Track ( II )" to judge parts resuability. - 6 -