hitachi — REMOVE AND INSTALL TRACK

UNDERCARRIAGE / Track Installation 1. Jack up the machine. Set the track under the machine so that the sprocket meshes with the track end. Check the direction of track at this time. Sprocket Side Idler Side CAUTION: The track assembly (standard spec.) weight: ZAXIS 330-3: 1750 kg (3860 lb) ZAXIS 330LC-3: 1870 kg (4120 lb) ZAXIS 350H-3, 350K-3: 1860 kg (4100 lb) ZAXIS 350LCH-3, 350LCK-3, 350LC-3, 350LCN-3: 1980 kg (4365 lb) 2. Hoist and place the track on sprocket (8). 3. With the machine jacked up, slowly operate the lever for the track to be installed in the forward direction. Turn travel device (9) and wind the track. 4. Wind the connection of track link to the front idler (4) side.

Lower the machine. Place a wooden block under shoe (5) and support shoe (5). W178-02-11-271 8 W105-03-07-014 W105-03-07-015 4 5 W105-03-07-016 Wooden Block W3-7-4 9 9