UPPERSTRUCTURE / Cab 6. Install covers (27) (2 used) to main frame (30) with bolts (28) (13 used) and washers (29) (13 used). 28, 29 : 19 mm : 50 N m (5 kgf m, 37 lbf ft) 7. Install duct (25) to brackets (16, 26) with bolt (24). 30 27 W1JV7-02-07-001 : 13 mm 16 24 : 20 N m (2 kgf m, 15 lbf ft) 8. Install the connector, plug and vinyl hose to cab (5). 25 26 W1JB-02-01-041 W2-1-6