4.
WEIGHT 1-15 1) R215LC-7 1) R215LC-7 R215LC-7 Item kg lb Upperstructure assembly 8950 19730 Main frame weld assembly 1720 3790 Engine assembly 530 1170 Main pump assembly 120 265 Main control valve assembly 200 440 Swing motor assembly 190 420 Hydraulic oil tank assembly 240 530 Fuel tank assembly 195 430 Counterweight 4200 9262 Cab assembly 310 680 Lower chassis assembly 8700 19180 Track frame weld assembly 2720 6000 Swing bearing 260 570 Travel motor assembly 305 670 Turning joint 55 120 Track recoil spring 140 310 Idler 170 370 Carrier roller 20 45 Track roller 50 110 Track-chain assembly(600mm standard triple grouser shoe) 1400 3090 Front attachment assembly(5.68m boom, 2.4m arm, 4025 8870 1.05m3SAE heaped bucket) 5.68m boom assembly 1530 3370 2.4m arm assembly 670 1480 1.05m3SAE heaped bucket 810 1790 Boom cylinder assembly 180 400 Arm cylinder assembly 290 640 Bucket cylinder assembly 175 390 Bucket control link assembly 170 370 Item R215LC-7 kg lb Upperstructure assembly 8950 19730 Main frame weld assembly 1720 3790 Engine assembly 530 1170 Main pump assembly 120 265 Main control valve assembly 200 440 Swing motor assembly 190 420 Hydraulic oil tank assembly 240 530 Fuel tank assembly 195 430 Counterweight 4200 9262 Cab assembly 310 680 Lower chassis assembly 8700 19180 Track frame weld assembly 2720 6000 Swing bearing 260 570 Travel motor assembly 305 670 Turning joint 55 120 Track recoil spring 140 310 Idler 170 370 Carrier roller 20 45 Track roller 50 110 Track-chain assembly(600mm standard triple grouser shoe) 1400 3090 Front attachment assembly(5.68m boom, 2.4m arm, 1.05m3SAE heaped bucket) 4025 8870 5.68m boom assembly 1530 3370 2.4m arm assembly 670 1480 1.05m3SAE heaped bucket 810 1790 Boom cylinder assembly 180 400 Arm cylinder assembly 290 640 Bucket cylinder assembly 175 390 Bucket control link assembly 170 370