Three-phase AC charging pile (If fitted) ■ Use an AC charging pile in a public place to charge the vehicle. The AC charging piles are commonly installed in the public places such as large supermarkets, shopping malls, and parking lots. ■ The BYD three-phase AC charging pile can be used to charge the vehicle. For the operations of charging equipment, please refer to its operation manual or operate as per the instructions. ■ Device specifications: 380V AC 50Hz 63A ■ Charge time:
Please see the charge time tips on the dashboard 94 4 -1 Charging and discharging descriptions Tip ● During the operations of seven-to-seven adapter, notice the identifications of power plug and charger to prevent reverse connection. ● The seven-to-seven adapter is not attached in the vehicle. If needed, please purchase from a BYD Auto Authorized Service Station. Tip ● If the external power grid is failed for a short time and then is restored, the BYD charging equipment will automatically restart the charging and it’s unnecessary to reconnect the charging equipment. ● The device must be well grounded.
If the charge device is faulty or damaged, the grounding wire can provide the circuit discharge with minimum impedance to reduce the risk of electric shock. Note ● Notice the parking position of vehicle before charging to ensure that the charging cables are not straightened during charging. ● If it’s necessary to end the charging in advance before the power battery is fully charged, please set up the charging equipment to end the charging in advance and do not cut off the power supply under loaded condition whenever possible. ● Please refer to the charging instructions for the detailed charging precautions.
Warning ● Please refer to the charging instructions for the detailed charging safety warnings.