7.3 Assembly The boiler can be mounted either on the fixing strip which is supplied in the box or to a wall mounting jig with an expansion vessel. The wall mounting jig includes an expansion vessel and shut off valves. If the fixing strip is used an external ROBO kit must be fitted as well. 7.3.1 Using the wall mounting jig + mounting bracket Using the fastening materials supplied, secure the jig vertically to the wall. Make sure the wall is suitable for placing the boiler. Secure the bracket with the shut-off valves in the jig by inserting it with the flanged side upwards through the openings (sleeves) in the jig. Note The appliance is wider than the jig.
Install the CH heating system and the DHW system to the valves. CAUTION Make sure that the boiler connections of the shut off valves remain in the correct position (= straight upwards). Do not over tighten connections. Do not turn tightened valves on pipes as this weakens joints within the boiler. H = H = H = 7.3.2 Using the fixing strip + ROBO kit. (8Ltr or 12Ltr) Position the fixing strip to the wall and drill the holes. Using apropriat fixing materials, secure the strip horizontaly to the wall. Make sure the wall is suitable for placing the boiler. Hang the boiler on the fixing strip and connect the ROBO kit to the boiler and installation.
+ Intergas Heating Ltd 22 840 Combi Compact HRE 36/30 780 Combi Compact HRE 28/24 720 Combi Compact HRE 24/18