voyah — Руководство по эксплуатации A/C системы VOYAH FREE 10 (EN)

10-102 A/C system 10. A/C and Safety System b. Unscrew 2 fixing nuts of the compressor pipeline. Tightening torque of nut: 8±1Nm. CAUTION: – Sealing pipeline connectors. c. Unscrew 3 fixing bolts of the compressor. Tightening torque of bolt: 25±2Nm. d. Remove the compressor assembly ① . Refitting procedure The refitting procedure is performed in reverse order. CAUTION: – Replace the O-ring with a new one, and apply A/C compressor lubricating oil to the O-ring. – Vacuum the A/C system after the refitting is completed (refer to 10.1.12.14 A/C system vacuuming – Add the refrigerant (refer to 10.1.12.12 Recovering/adding refrigerant) VOYAH FREE