voyah — Руководство по эксплуатации A/C системы VOYAH FREE 10 (EN)

10-112 A/C system 10. A/C and Safety System g. Remove the front evaporator outlet pipe assembly ① . Tightening torque of bolt: 8±1Nm. CAUTION: – Sealing pipeline connectors. Refitting procedure The refitting procedure is performed in reverse order. CAUTION: – Replace the O-ring with a new one, and apply A/C compressor lubricating oil to the O-ring. – Vacuum the A/C system after the refitting is completed (refer to 10.1.12.14 A/C system vacuuming – Add the refrigerant (refer to 10.1.12.12 Recovering/adding refrigerant) VOYAH FREE