10-124 A/C system 10. A/C and Safety System 10.1.10.15 Removal and refitting of battery cooling module A/C pipe assembly (REV) Removal procedure 1. Turn off all electrical appliances and the start switch. 2. Disconnect the battery negative termin al (refer to 3.1.6.1 Maintenance and inspection of battery ) 3. Recover the refrigerant (refer to 10.1.12.12 Recovering/adding refrigerant) 4. Remove the front evaporator outlet pipe assembly (refer to 10.1.10.10 Removal and refitting of front evaporator outlet pipe assembly (REV) 5. Remove the front evaporator inlet pipe assembly (refer to 10.1.10.12 Removal and refitting of front evaporator inlet pipe assembly (REV) 6.
Remove the battery cooling module A/C pipe assembly. a. Unscrew 1 fixing bolt of the battery cooling module A/C pipe assembly. Tightening torque of bolt: 10±1Nm. CAUTION: – Sealing pipeline connectors. VOYAH FREE