F2B ENGINE 99 T RAKKER E URO 4/5 Print 603.93.641 Base q November 2006 Figure 200 112329 Tofit the belt (1) use appropriateequipment (2) to adjust the belt tensioner in the direction indicated by the arrow. N Ap Mo 993 sys 993 By dir pos N N - Mo - - Figure 202 106224 OTE To fit the elastic belt commanding the climate control compressor, you must use tool number 99360192 (4). Any other method might cause tension that would be harmful to the elastic belt itself. NOTE Automatic tensioners do not requir e further adjustments after the installation. Figure 201 102650 COMPRESSOR CONTROL BELT ASSEMBLY DIAGRAM 1. Alternator - 2. Air conditioner compressor - 3.
Electromagnetic joint; - 4. Water pump - 5. Crankshaft - 6. Spring belt ply tool 99360321 (2) to gears box (1). unt spring belt (3) on driving shaft pulley, mount chock 60192 (4) on compressor pulley (5) for climate control tem. Position spring belt (3) in the opening of tool 60192 marked with kcursor 8y. tool 99360321, rotate driving shaft (6) according to the ection of the arrow ( ) until spring belt (5) is correctly itioned on compressor pulley (3). OTE While operating, keep tool 99360192 (4) in contact to pulley (3) and at the same time guide spring belt (5) in order to prevent it from twisting. OTE Spring belt must be replaced by a new one after every dismounting operation.
Supply engine with oil provided quantity. Dismount engine from stand and mount starter. unt: sound deadening guard; pipes.