Department of the Army AR 700-127 — Army Regulation AR 700-127 Integrated Logistics Support Manual (2007) PDF (EN)

Downloaded from https://www.everyspec.com Contents—Continued Develop business case analysis – BCA policy • 4–13, page 25 Implementation and assessment — PBL reporting requirement policy • 4–14, page 28 Chapter 5 Supportability, ILS Management, Maintenance Planning, and Other Considerations, page 28 Section I Supportability Planning, page 28 Supportability strategy • 5–1, page 28 Supportability analysis and logistics management information • 5–2, page 29 ILS planning considerations • 5–3, page 30 Resourcing • 5–4, page 30 Supportability test and evaluation • 5–5, page 31 Supportability testing restrictions • 5–6, page 31 Section II ILS Management Structure, page 31 ILS manager • 5–7, page 31 Supportability integrated product team • 5–8, page 31 Section III Maintenance Planning, page 32 Maintenance support plan • 5–9, page 32 Level of repair analysis • 5–10, page 33 Maintenance task design parameters — system engineering process • 5–11, page 33 Reliability centered maintenance • 5–12, page 33 Condition-based maintenance • 5–13, page 34 System support package • 5–14, page 34 Logistics demonstration • 5–15, page 34 Core logistics analysis • 5–16, page 34 Depot maintenance planning and source of repair determination • 5–17, page 35 Section IV Supportability Considerations, page 39 Force development documentation • 5–18, page 39 Commercial and nondevelopmental items • 5–19, page 39 Manpower and personnel integration with integrated logistics support • 5–20, page 39 Environmental impact • 5–21, page 40 Software • 5–22, page 40 Post-production support planning • 5–23, page 40 Integrated logistics support after fielding (continuous evaluation) • 5–24, page 41 System survivability • 5–25, page 41 Materiel release and materiel fielding • 5–26, page 41 Advanced technology demonstrations • 5–27, page 41 Chapter 6 Contractor Logistics Support, page 42 General • 6–1, page 42 Application of CLS • 6–2, page 42 Planning • 6–3, page 42 Funding considerations • 6–4, page 44 Contractor logistics support for tables of distribution and allowances unit training systems • 6–5, page 44 Contractor constraints • 6–6, page 44 Appendixes A.

References, page 45 iii AR 700–127 • 27 September 2007