Line Balancing Process Handler When the Process Manager executes a process, it relies on a series of internal objects to manage the inter- action with the hardware. The Process Manager is responsible for organizing and containing the inform- ation that is going to be processed. The Process Handler is responsible for using that information and managing the execution of the process. In general, the runtime operation of the Process Manager will use the Part Process information to locate Part Instances and Part Target Instances. Internally, the Process Handler maintains a collection of internal objects that are responsible for interacting with individual elements of the hardware.
These objects fall into two categories: objects that generate Part Instances and Part Target Instances and objects that can process the instances. Controller Queue The Controller Queue represents a controller with associated robots that can pick from Part Instances and place to Part Target Instances. The Controller Queue communicates with the V+ Queue Manager task that manages the collection of parts to be processed by the robots on a given controller. The Controller Queue receives notification as the controller processes the instance information. The Controller Queue also monitors for "robot down" or capacity issues with the robots connected to the controller.
It notifies the Process Manager through an event, in the case that the controller is unable to pro- cess the items in its queue within a given time-frame. The "time-frame" is based on the belt speed and loc- ation of the parts on the belt given the upstream/downstream limits of the individual robots. The Controller Queue maintains state information regarding its ability to accept parts. This information is used by the Process Strategy when determining how to allocate parts. The Controller Queue also maintains statistics that are captured for a certain number of cycles, such as idle time, processing time, and parts/targets processed per minute.
This information is available to the user and may be used in the allocation of Part Instances. Line Balancing A Process Strategy is invoked to determine how to allocate the Part Instances and Part Target Instances identified by the Process Manager. It uses the list of Part Processes to allocate the instances to specific robots. The output of this process is passed to the Controller Queue object by the Process Manager. Each Process Strategy operates under certain assumptions based on the process being monitored. Those assumptions determine which algorithms are used to perform the allocation.
Process Strategy This process strategy is predicated around certain assumptions on how robots will handle Parts and Part Tar- gets. For part processing, the overflow from an upstream robot will be passed to the next downstream robot on the same controller. In other words, the first robot along the conveyor will pick all parts it is cap- able of picking. Any part it cannot pick will be picked by the next robot in the line. This pattern is repeated for all robots in the line. ACE User's Guide, 3.6.x 18316-000 Rev A Page 804