omron — Processes

Processes l Single Refinement: Select this item for a single-vision-refinement application when: l Only one part at a time is being moved by the robot, or l A multi-tip-gripper is moved to the vision refinement station, but only one picture is taken that includes all parts on the gripper. If you want to process an individual refinement for each part, use the Multi Refinement option. Use the field below to browse for the vision refinement station. l Multi Refinement: Select this item for a multiple-tip-gripper applications. Use the field below to specify the tool tip and corresponding vision refinement. Each tip will be moved individually to the specified vision refinement station.

Use the Up/Down arrows to change the order of the tip processing. The Select process only if items are in range option tells the system to only select this process if all parts and targets are "in range" of the robot. For example, if parts are upstream of the belt window, you may not want the process to be selected. This allows you to constrain the process selection. Changing the Process Priority You can change the priority for a process by using the Up/Down arrows on the Process Group editor, shown in the following figure. NOTE: In addition to the arrows, you can also affect process priority through the Process Selection Mode setting of the Robot Parameters on the Process Strategy dialog.

For more details, see Robot Para- meters on page 881. Up/Down Arrows The process priority is used in situations where multiple processes are defined, and a given robot is capable of doing several of the potential processes. The process at the top of the Process Group list receives highest priority. ACE User's Guide, 3.6.x, 18316-000 Rev A Page 893