1.7. CE-conforming equipment Introduction Manufacturer-supplied CE-conforming equipment A1 Distance: bucket pivoting point - front axle, horizontal A2 Distance: bucket pivoting point - front axle, vertical B1 Distance: driver's eye - front axle, horizontal B2 Distance: driver's eye - front axle, vertical D1 Distance front axle- lower edge of headlights, horizontal D2 Distance front axle- lower edge of headlights, vertical G Weight of the equipment and carrying load without additional counterweight H1 Distance: bucket pivoting point - bucket upper edge, vertical (carrying position) H2 Distance:
bucket pivoting point - vision line, vertical (carrying position) J Distance road level - lower edge of bucket in carrying posi tion (to be considered during driving on public roads) Sh Distance:
road level - front axle a Tip-in angle b1 Bucket connection dimension boom width, interior c Bucket connection dimension between d1 and d2, vertical d1 Bucket connection dimension bolts for boom d2 Bucket connection dimension bolt for tip-in rod e Bucket connection dimension d1- d2 horizontally displaced h Distance lower edge of bucket - drill hole of boom bolt 1-24 WA90-5 – VEAM270100 WA90-5 mm A1 1780 A2 1273 Sh 518 B1 1846 B2 1951 C1 1356 C2 1578 D1 225 D2 1103 G 2250 H1 886 H2 1480 J 270 X1 2035 X2 890 Y1 2115 Y2 975 a 50 b1 960 c 423 d1 40 d2 40 e 98 h 230 Tyre 405/70 R20 SPT9 Bucket 1,05 m³ (42W-70-22020)