Operation For loading, transportation Q’ty Specification Tools for installing tightening Q’ty Specification Others nstalling work equipment Boom 7.9 ton Arm 5.6 ton -1. Wire 20@ x 5m 2 JIS No. 4 y-7 2. Wire 3Of#~ x 5m 1 JIS No. 4 Sledge hammer “10 (45kg) 2 Bar lOOOIl I 2 \ * Helmet * Safety boots Lubricating agent 1 1 1 KES07882 LM-P * Cleaning bucket - Cleaning brush Bucket 8.2 ton * Oil pan * Paint (Yellow, space blue 6. Shackle SC36 3 For 8 ton 7. Lever block 1.5-3 ton 2 1 ton lever block . . . . . F *.%. Riken pump ram 1 set ’ tqarn ,Rl-63 Installing track frame 8. Wire 30@ x 5m 2 JIS No. 4 I I Tools which enable work to be carried out faster I .
Engine compressor * Impact wrench KW45FS Unnecessary when using self-propelled specrfication I ! * Impact socket spline x 65 mm 12a. Corner pad 4 To prevent damage to wire rope 12. Revolving frame stand 4 a’_IU”mor wooden sleeper * Impact wrench (010,@12,@t6) * Impact wrench air hose Track frame For extending, tightening Power wrench 12x or 16x 1 Tone x12 wrench,x,s WrenchcBnbe 1x1s wrench CB” be “red, Torque wrench 1 5OOQ .kgcm IUse x12 ai kgm;xl6 at 24 kg1 I I or 38.1ox 60 1 (for xlE Socket 25.4% 60 1 Tightening torque (for xl2 I I Socket 38.1 x 65 2 Tightening torque 350 - 430 kgr Counterweight 14 ton 13.
Wire (2) For work equipment and counterweight xl 6 wrench 1 1 1 Tone x16 wrench (for xlf Torque wrench I 1 I 5000 kgcm(Use at 28 kgrr I I , set l#‘sccket. lZ”socket,sPa”“er chisel. bench, adjustable wrenc I Working lamp 15V x 6 ) 1 Operator’s cab, 14. Wire 106 x 3m 2 machine cab Maintenance work 15. Wire 126x 3m 2 Standard tool set 16. Lever block 3/4 ton (I) Hydraulic oil 300 Q EOIO-CD (SAEIOW) 17. Shackle sc18 4 Grease pump for track 1 07950-l 0450.07951-210~ Grease for track 4 07950-90403 3-pin T-adapter Digital voltmeter 1 1