Hino — Installation Steps

00-20 POWER TAKE OFF Draw the control cable in the instrument panel bottom inside the cab and firmly install the grommet. Legend 1. Cable holder 2. Control cable 3. Truck front 4. Lock nut 5. Special nut 6. PTO Firmly install and fix the clip in the cable flange portion groove. 6. Lock Nut (Dump Lever Side) Assemble the control cable tip in the boss por- tion of the dump lever and tighten the lock nut at a specified torque. At this time, check that the “L” dimension is 34 ± 1 mm (1.339 ± 0.039 inch.) Tighten:

Lock nut to 6 N m (0.6 kg m / 52 lb in) If the “L” dimension does not satisfy the speci- fied value, remove the cable holder from the PTO and rotate the cable holder to adjust the dimension. Notice: Both “clockwise rotation” and “counterclockwise rota- tion” indicate that the cable moves by about 0.75 mm (0.0295 inch) every time the cable holder rotates by 180 degrees. Re-install the cable holder on the PTO and tem- porarily tighten the bolt. 4. Lock Nut (PTO Side) After having checked the specified value di- mensions of the cable outer threaded portion, temporarily tighten the lock nut. Notice:

Tighten the special nut and lock nut after having adjust- ed it in accordance with the work procedure of the “Con- trol Cable Adjustment”. NPA0042E Legend 1. Clip 2. Control cable 3. Boss portion 4. Lock nut Notice: If the double nut position of the control cable is not fixed, it is fixed to a reference value. Control cable length (Reference): 18 ± 1 mm (0.709 ± 0.039 in) NPA0041E Legend 1. Lock nut 2. Special nut 5. Clip (Cab Inside)