ZF — Shop Manual: ZF Transmission — Repair, Clutch & Gear Schematics (EN)

TRANSMISSION Ch 2 page 220 Mount and grease the O-ring 108x3 (1). Install, align and grease the rectangular ring 65x3 (2). Figure 708 Install screw plug (1) into the housing II. NOTE Depending on the versions the number of screw plugs may differ. The required number is indicated in the corresponding spare parts list! Install the preassembled PTO-shaft (2) in housing II until contact. Figure 709 Install the bolted connection pump flange/housing II (1) with the cylindrical screws. Tightening torque (M12/8.8x45) MA = 79 Nm Insert O-ring 155x3 (2) into the annular groove and grease it. Figure 710 PTO-gear – 1st power take-off Heat up the bearing inner ring (approx. 120° C).

Figure 711 SHOP MANUAL