UPPERSTRUCTURE / Swing Device 21. Install spring pin (17) into the hole on second stage carrier (9) by using special tool (ST 1463). NOTE: Install spring pin (17) with the slit facing to the motor side. Concave 9 11 35 17 18 Motor Side Slit W178-02-06-002 22. Install planetary gears (15) (2 used), thrust plates (14) (2 used), (16) (2 used), pins (18) (2 used) and spring pins (17) (2 used) to other hole (2 places) on second stage carrier (9) in the same procedures as steps 19, 20. 23. Install thrust plate (5) to first stage carrier (6) with the oil groove side facing upward. 24. Install needle bearings (21) (3 used) to planetary gears (20) (3 used).
Install planetary gear (20), thrust plates (19) (3 used), pins (23) (3 used) and spring pins (22) (3 used) to first stage carrier (6) in the same procedures as steps 19 to 22. W178-02-06-014 26. Install second stage sun gear (7) to the second stage carrier (9) assembly. Install second stage sun gear (7) with the thinner side facing upward (the motor side). 27. Remove old adhesive and clean housing (27) and the ring gear (3) mounting surface. Apply THREEBOND #1215 onto this surface. NOTE: When removing and installing spring pin (22), use special tool (ST 1462). CAUTION: The second stage carrier (9) assembly weight: 23 kg (51 lb) 25.
Install the second stage carrier (9) assembly to the spline in shaft (35). W2-6-21