hitachi — REMOVE AND INSTALL ENGINE

UPPERSTRUCTURE / Engine 23. Install harness (106) to the terminals (2 used) in alternator with nut (102) and screw (108). Install terminal covers (101, 107). Install connector (103). Install clips (104) (2 used) in harness (106) with bolts (105) (2 used). : 12 mm : 13 mm : 20 N m (2 kgf m, 15 lbf ft) : 17 mm : 50 N m (5.1 kgf m, 37 lbf ft) IMPORTANT: Before installing harness (114) to the terminal in starter motor (112), remove the grounding wire in battery. If the work is continued with the grounding wire connected, the circuit may be shorted. 24. Install harness (114) to the terminals (2 used) in starter motor (112) with nuts (111) (2 used).

Install the grounding wire to the bracket with nut (113). Connect the grounding wire in battery. W1J1-02-14-010 : 17 mm : 50 N m (5.1 kgf m, 37 lbf ft) : 140 N m (14.3 kgf m, 103 lbf ft) 25. Install harness (92) to overheat switch (94) with nut (93). : 22 mm 114 Grounding Wire W1J1-02-14-009 Radiator Pipe : 6.6 mm W1J1-02-14-022 94 93 92 W2-14-20 Alternator 101, 102 103 107, 108 106 104, 105 W Alternator 101, 102 103 107, 108 111 112 Bracket