Doosan G643 LP Engine — DOOSAN G643 LP Engine Service Manual PDF Download (EN)

Cylinder Heads Valve Clearence (1) The 4.3 liter engine has screw-in rocker arm studs with positive stop shoulders, NO valve adjustment is necessary. When the valve train requires service you simply tighten the rocker arm nuts to 25 N·m (18 lb·ft) . NOTE : When installing the cylinder heads use a new head gasket. Do not use sealer on the composite gasket. Tighten the cylinder head bolts in the following sequence. All bolts are torqued to a torque of 30 N·m (22 lb·ft) . On the second pass a tool A degree wheel must be used. Bolts in sequence. 1 . Short length bolts (11, 7, 3, 2, 6, 10) 55 degrees 2 . Medium length bolts (12, 13) 65 degrees 3 .

Long length bolts (1, 4, 8, 5, 9) 75 degrees G643 (E) Service Manual Chapter 3. Engine Mechanical System 40 Tools Needed A Torque Angle Meter 1