HYDRAULIC SYSTEM Ch 5 page 62 Operating Instructions Only fluids in Group 2 as defined by the Pressure Equipment. Before installation, refer to the pressure and temperature limits shown on the nameplate. For cyclic loading, consult Parker or Hydroll regarding the fatigue-free working pressure range or limiting of the number of cycles for finite life applications. Maintenance Accumulators must be regularly examined, checked for general condition, and maintained on a periodic basis. The frequency and extent of inspection required will depend on experience with the particular application.
It is the responsibility of the accumulator installer to set the frequency of maintenance appropriate to the application, but a period of one year between inspections is considered to be an acceptable maximum. In the case of finite life applications, Parker recommends inspection of the accumulator when one half of the allowable load cycles has been completed or after a period of one year – whichever occurs first. If the user is not competent to make the necessary assessment of reliability, then expert advice must be obtained. Examination shall consist of visual inspection of the physical integrity of the equipment and, where applicable, a functional test.
Maintenance routines shall be performed by authorised personnel only and shall include the verification of settings and operational testing where applicable. Maintenance shall also include routine testing of individual devices after specified service cycles and the exchange of components before the end of the projected lifetime. Maintenance programs and work, results of examinations and any resulting remedial measures taken shall be documented and retained for 10 years or the lifetime of the installation (if shorter). Replacement of components shall be documented and retained in the same way.
Repair Kits are available for all accumulator models; replacement of the piston seals is generally the only maintenance required. When ordering repair kits, state the complete model number from the nameplate and specify the type of fluid and operating temperature. Replacement of other seals on end caps and the gas valve is also recommended. Periodic checking of the pre-charge pressure, will provide early warning of deteriorating piston seal performance. If pre-charge pressure is low, check also for gas valve and/or end cap seal leakage.
Allowing for temperature difference, if any, the pre-charge pressure will rise if oil collects in the gas side and will fall if gas leaks into the oil side or past gas end cap seals. It is suggested that a check be made a week after installation, and thereafter once every three months or at intervals determined by the system builder. SHOP MANUAL