20 EXCAVATOR OPERATION BOOM SWING PEDAL B Operation of the Track Width 1. Set the track width change/dozer select lever to the "Track width change" position (B). To avoid personal injury or death: A Always keep your toes within the edge of foot step; otherwise there is a possibility that your toes will be caught between swing frame and boom or boom cylinder. To avoid personal injury: A When boom swing operation is not in use, fold the boom swing pedal forward to fix the pedal from unexpected moves. (1) Track width change / dozer select lever (A)"Dozer" (B)"Track width change" 2. Push the control lever forward. ... The track width reduces from 860mm to 700mm. Pull the control lever backward.
... The track width increases from 700mm to 860mm. (A) "Fix" OPERATION OF TRACK WIDTH CHANGE AND DOZER To avoid personal injury: A Do not operate in narrow track width 700mm, there is a risk of the excavator tipping over, always operate in standard track width 860mm, except when passing through narrow spaces on a even ground. A For changing the track width or using the dozer, set the track width change/ dozer select lever fully. If not, the excavator may unintentionally move. (1) Control lever (A) "Reduce" (B) "Increase"