* If long oil change intervals are to be used, ACEA-E3 oil must be used. - 19 - TECHNICAL INFORMATION Rocker arm Cam shaft Air compressor A/C Piston Water pump W/P BRG Turbocharger T/C Fuel injection I/P pump Con-rod bearing Main bearing Oil spray nozzle 1.3bar Main oil gallery Oil cooler Oil filter Oil pump Relief valve 4.4bar Valve 5bar Valve 2bar Valve 10bar EQM4005L .5.1. Engine Oil • Check oil level with the oil level gauge and replenish if necessary. • Check the oil level with the engine cooled. If the engine is warm, allow time for 5 ~ 10 min- utes for oil drain into the crankcase before checking oil level. The oil level must be between Max and Min. lines on the gauge.
• Engine oil should be changed at the specified intervals. Oil in the oil filter should be changed simultaneously. First oil change After 1,000km (50hr) operation DE12T/TI/TIA Construction equipments every 250hr DE12TIS • The following oils are also recommended Recommend oil Engine model SAE No. API No.
DE12T/TI/TIA SAE 15W40 above CD or CE SAE15W40 ACEA-E2 or ACEA-E3 DE12TIS SAE10W40 (API CH-4) Rocker arm Cam shaft Air compressor A/C Piston Water pump W/P BRG Turbocharger T/C Fuel injection I/P pump Con-rod bearing Main bearing Oil spray nozzle 1.3bar Main oil gallery Oil cooler Oil filter Oil pump Relief valve 4.4bar Valve 5bar Valve 2bar Valve 10bar EQM4005L Engine model Recommend oil SAE No. API No. API No. DE12T/TI/TIA SAE 15W40 above CD or CE DE12TIS SAE15W40 SAE10W40 ACEA-E2 or ACEA-E3 (API CH-4) First oil change After 1,000km (50hr) operation Construction equipments DE12T/TI/TIA every 250hr DE12TIS