. OPERATION OPERATION OPERATION OPERATION follows and drive the CAUTION 3 - 141 6. If ther e is too much material loaded in the bucket, d ump and tilt the b ucket q uickl y to rem ove the load . preve nts spillage of the load during h auling. DIGGING AND LOADING ON LEVEL GROUND When d igging and lo ading o n level g round set th edg machin e forwa rd. Al ways be careful n ot to load th e bucket on one side and cause an unb This op eration shoul d be carr ied out i n 1st gear. Do not set t he buck et faci ng down more than 20 degrees 1. Set th e edge of the bucket f acing sli ghtly down 2.
Drive t he machine f orward a nd opera te the lift arm control lever forwar d to cu t a t hin layer of the surface each time when surface each when excavating th e soil. 3. Opera te the lif t arm control le ver sligh tly up and down to reduce the re sistance whe n driving the machine forward. When digging with t he bucke t, avoid i mposing the d igging force on on e side o f the