John Deere 7200 Flex-Fold MaxEmerge 2 — John Deere 7200 Flex-Fold MaxEmerge 2 Operator's Manual PDF (EN)

Liquid Fertilizer Attachment To fill liquid fertilizer tanks, proceed as follows: Close shut-off valves (A) to metering tanks. pumps filling If shut-off valve lever is hard to operate, proceed as follows: -UN-O60CT88 NOTE: when Internal: O-rings located in the valve prevent valve leakage. The “preload” on these O-rings A29938 can be adjusted to allow both leak-free operation and easy operation of valve lever. Turn large nut (B) until lever moves smoothly without overtighten, which can cause damage to the O-rings. B21,7AT,J -19-28JUN90 B21,7AT,K -19-28JUN90 BSS Sa -UN-O60CT88 dust cover from A30178 Close valve (A) and remove quick-attaching coupler.

A29939 -UN-060CT88 Open shut-off valve (A) on fill pipe. 1 00-2 180790