Preparing the Planter LUBRICATION A29689 -UN-21MAR89 Be sure your planter and planting units have been properly lubricated. (See Lubrication section.) ASIKS9 SELECTING SEED METERS ONLY) PLATES (PLATE B22,7PU,B -19-28JUN90 B21,1Pi,I -19-28JUN90 SEED Consult your copy of the “Plate Metering Units”’ Operator’s Manual for information on selecting the desired seed plate. 20-2 180790