Preparing the Vacuum Meter Unit Check the seed cell and hole for flash (particles of material left behind in the molding process). Remove any flash before installing seed disk. If flash cannot be easily removed, the disk should be replaced. Make a field check to determine seed meter accuracy. It is not necessary to replace any seed -19-30JAN89 NOTE: disk if metering performance ts satisfactory. A34190 FLASH A34190 INSTALLING SEED B22,9PU,U -19-28JUN90 B22,9PU,C -19-28JUNS90 B22,9PU,D -19-28JUN90 DISK To install seed disk in vacuum metering unit: hose (A) from metering unit. A30274 -UN-130CT88 1. Remove vacuum A30210 -UN-130CT88 2.
Remove seed hopper from planting unit by disengaging hopper latch (A) and lifting hopper upward and rearward. 35-8 180790