190 Safety Section (Pipelayer Attachment Kit) WEBM1000 Parking When the load capacity is exceeded, refer to “American National Standards A.N.S.I. B3014”. Also, follow the procedures that are listed below: Inspect the wire cable for defects prior to the lift operation. Inspect the wire cable for defects after the lift operation. Do not exceed the load capacity of the boom. The load must be handled safely in order to minimize tipping effects. The lift operation and the inspections must be made under controlled conditions by an authorized person. Parking Electrical Power Lines Park on a level surface. If you must park on a grade, use blocks to prevent the machine from rolling.
m WARNING Apply the service brake in order to stop the machine. Move the transmission control lever to NEUTRAL position and move the engine speed switch to the LOW IDLE position. Engage the parking brake. Serious injury or death by electrocution can result if the machine or attachments are not kept the proper distance from electrical power lines. Use the following charts in order to determine the safe distance from high voltage wires during these conditions: Lower any load to the ground and fully retract the counterweight. Refer to the tractor's operation and maintenance manual for the specific procedures regarding engine shut down and/or other implement attachments.
machine operation machine transportation Slope Operation Table 28 Machines that are operating safely in various applications depend on these criteria: the machine model, configuration, machine maintenance, operating speed of the machine, conditions of the terrain, fluid levels and tire inflation pressures. The most important criteria are the skill and judgment of the operator. A well trained operator that follows the instructions in the Operation and Maintenance Manual, has the greatest impact on stability. Operator training provides a person with the following abilities:
observation of working and environmental conditions, feel for the machine, identification of potential hazards and operating the machine safely by making appropriate decisions. When you work on side hills and when you work on slopes, consider the following important points:
While In Transit Near High Voltage Power Lines Normal Voltage (Phase to Phase) Minimum Clearance Required 0 Volts to .75 kVolts 1.22 Meters (4 Feet) Over .75 kVolts to 50 kVolts 1.83 Meters (6 Feet) Over 50 kVolts to 345 kVolts 3.05 Meters (10 Feet) Over 345 kVolts to 750 kVolts 6.10 Meters (20 Feet) Over 750 kVolts to 1000 kVolts 7.62 Meters (25 Feet) When Operating Near High Voltage Power Lines Normal Voltage (Phase to Phase) Minimum Clearance Required 0 Volts to 50 kVolts 3.05 Meters (10 Feet) Over 50 kVolts to 200 kVolts 4.60 Meters (15 Feet) Over 200 kVolts to 350 kVolts 6.10 Meters (20 Feet) Over 350 kVolts to 500 kVolts 7.62 Meters (25 Feet) Over 500 kVolts to 750 kVolts 10.67 Meters (35 Feet) Over 750 kVolts to 1000 kVolts 13.72 Meters (45 Feet)