Caterpillar — Removal of the Boom

208 Operation Section (Pipelayer Attachment Kit) WEBM1000 Before Operation 280 Illustration 280 Fastening of Load Blocks for Transport 4. Remove pin (6) and insert stowing-link (4) into bumper pocket (7) and reinstall pin (6). 281 5. Place hook load line over guide (5). 6. Slowly draw in the excess hook load line, when the load block and hook block are suspended by the load line, swing in the load block and hook block and lock into stowing- link (4) and tighten up the load line, being careful not to kink or damage load cable. Illustration 281 7.

To remove load block and hook block from stowing-link, reverse the above steps, and ensure the stowing-link is placed firmly back into the slot in bumper. Location of pins for removal of boom 12. Fasten an appropriate lifting device to the boom. The approximate weight of the boom is 936 kg ( 2064 lb). 8. Lower the boom to the horizontal position onto wood blocks that are sufficient to support the boom. 9. Remove the cotter pin, the retainer, and pin (2). The approximate weight of the luff block is 76 kg (168 lb). 13. Remove the cotter pins, the retainers, and the pins (8) from both sides of the support. 14. Remove the boom from the machine. Replace the pins in the support. 10.

Replace the pin and the retainer (2) in the boom. 11. Move the luff block clear of the boom and area; it will be secured after the boom has been removed.