24. SERVICE PROCEDURE Prepare the following. Container for drained coolant EG125B-2: at least 30 2 (7.92 US gal, 6.6 UK gal) EG125BS-2: at least 21.5 2 (5.68 US gal, 4.73 UK gal) Hose for adding water. Stop the engine and turn radiator cap @ slowly to remove it. Set a container under drain valve @), drain valve @ and drain valve @ to catch the drained coolant. Open drain valve @ at the bottom of the radiator and drain valve @ and drain valve @ on the side face of the cylinder block, and drain the coolant. After draining the coolant, close drain valve @, drain valve @ and drain valve @, and fill the radiator with tap water.
When the radiator is full, run the engine at low idling, open drain valve @, drain valve @ and drain through the system for 10 minutes. valve @ and flush water Adjust the flow of the water flowing in and draining out to ensure that the radiator is always full during the flushing operation. While flushing water through the system, watch carefully that the water inlet hose does not come out of the radiator filler AD726820 port. 6. After flushing, stop the engine, open drain valve @, drain valve @) and drain valve @, drain the water, then close the valves again. After draining cleaning. the water, use a cleaning Follow the instructions on the cleaning carrying out the cleaning operation. 8.
agent to carry out agent container when After cleaning, open drain valve @, drain valve @ and drain valve @, drain out all the water, then close drain valve @, drain valve @ and drain valve @, and fill with tap water to near the water filler port. When the water comes to near the water filler port, run the engine at low idling, open drain valve ©, drain valve @ and drain valve @), and continue to run water through the system until clean water comes out. 3-29