eng — 12.6 PARALLEL-ARRANGED OPERATION

12. OPERATION When running a second generator in parallel-arranged operator during operation under load. 1. Warm up the generator No. 2 (to be turned on). 2. Set the frequency and voltage of the generator No. 2 (to be turned on) slightly higher than the generator running under load. Adjust with governor handle @® so that synchronizing lamp @ of the generator No. 2 (to be turned on) flashes slowly. When the flashing cycle is more than five seconds, switch on breaker © of generator No. 2 (to be turned on) at the moment synchronizing lamp @ stops flashing. If the ammeter readings on each generator are not the same, adjust with speed control handle @. 2-38 AE726720