DL06 Operation and Maintenance torque. (30 ± 2 kg.m). z Tighten the bearing cap in the sequence of 4 – 3 – 5 – 2 – 6 – 1 - 7 . z Check to see that the assembled crankshaft turns smoothly with hand. 3.3.6. Tappet & cam shaft z Undercool a new bush with dry ice for about 2 hours and press it into position in the cylinder block using a bench press. After the pressing operation, measure the inside diameter of the cam bush to check if it is not deformed. z Apply engine oil to the entire face of the tappets and slide them into the tappet holes on the cylinder block. 3.3.7. Timing gear case z Mount a new gasket using dowel z Put the time gear case to the pin on the cylinder block.
cylinder block by aligning the dowel pin hole of timing gear case with its pin, and then assemble it by tapping lightly with an urethane hammer to the right and left. (Particularly around dowel pin) z Tighten the bolts for assembling to the specified torque. However, in case of tightening the bolts, tighten primarily the bolts of both end parts and then do the rest. Relief valve 100 Engine Reassembly Printed in Nov. 2006 PS-MMA0418-E1 Relief valve 2.6 +0.5 kg.m Timing gear case fixing bolt 4.4 +0.5 kg.m