hyundai — G1,2.indd (FR)

1. POWER CIRCUIT 1. POWER CIRCUIT The negative terminal of battery is grounded to the machine chassis. When the start switch is in the OFF position, the current flows from the positive battery terminal as shown below. OPERATING FLOW OPERATING FLOW Battery Master switch [CS-74] Fusible link (CN-60) Start switch [CS-2 (1)] I/conn [CN-5 (2)] 1) 1) Fuse box [No.1] I/conn [CN-5 (1)] I/conn [CN-1 (1)] Cluster [CN-56 (26)] I/conn [CN-11 (1)] Room lamp [CL-1 (1)] Radio & USB player [CN-27 (8)] I/conn : Intermediate connector I/conn : Intermediate connector 2) 2) CHECK POINT CHECK POINT GND :

Ground 4-11 Engine Start switch Check point Voltage OFF OFF ① - GND (Battery) ② - GND (Master switch) ③ - GND (Fusible link) 10~12.5 V