Hitachi Construction Machinery — Disassembly of Standard Pilot Valve for Front Attachment

BODY (UPPERSTRUCTURE) / Pilot Valve 12. Remove socket bolts (35) (2 used) and nuts (47) (2 used) from casings (34, 48). Separate casings (34, 48) and sub plate (41). 20. Remove detent casings (20, 44) from covers (9) (2 used). : 6 mm 13. Remove O-rings (40) (2 used) from sub plate (41). 14. Remove O-rings (40) (2 used) from casing (34). 15. Secure casings (34, 48) in a vise. Remove socket bolts (39) (4 used) from port plates (38) (2 used). NOTE: Do not push rod (18) which is inserted into detent bushing (15) without steel balls (16) (3 used). 21. Remove solenoids (19, 42, 43) from detent casing (20, 44). NOTE: When removing solenoids (19, 42, 43) do not pull a lead wire. 22.

Remove lock plugs (6) (2 used) from levers (4) (2 used). : 6 mm 16. Remove port plates (38) (2 used) and O-rings (37) (2 used) from casings (34, 48). : 3 mm 23. Remove camshafts (8) (2 used) from covers (9) (2 used). 24. Remove levers (4) (2 used) from covers (9) (2 used). 25. Remove nuts (2) (4 used) and screws (3) (4 used) from levers (4) (2 used). 17. Secure plates (23) (2 used) in a vise. Remove socket bolts (1) (4 used) from the shallower hole on cover (9). : 5 mm 18. Remove covers (9) (2 used) and detent casings (20, 44) from plates (23) (2 used). NOTE: As spring guides (21) (4 used) is installed to detent casings (20, 24) by grease, do not drop spring guides (21) (4 used). 19.

Remove springs (22) (4 used) and spring guides (21) (4 used) from plates (23) (2 used). : 13 mm 26. Remove an assembly of detent bushings (15) (4 used), push rods (12) (3 used), push rod (18) and bushings (14) (4 used) from the mounting side by using the special tool. Dia. 10 -0.3 -0.4 mm (Dia. 0.39 ) -0.012 -0.016 in Dia. 8 -0.2 -0.3 mm (Dia. 0.32 ) -0.008 -0.012 in (1.58 in) W4GB-02-06-012 W2-8-9 30° 30 mm (1.18 in) 2 m 2 m