Hitachi Construction Machinery — Removal and Installation of Cab

BODY (UPPERSTRUCTURE) / Cab 8. Connect hose (40) between charging block (4) and parking brake (41) in the transmission. 4 : 39 N m (4 kgf m, 28.5 lbf·ft) 9. Connect hose (33) between brake valve (39) and front axle (32). Connect hose (35) between brake valve (39) and suction tube (34). Connect hose (36) between brake valve (39) and the rear axle. Secure clamps (37) (4 used) to the frame with sems bolts (38) (4 used). : 17 mm 40 41 Transmission W4GB-02-01-009 32 33 : 19 mm 34 : 29.5 N m (3 kgf m, 21.5 lbf·ft) : 22 mm 35 : 39 N m (4 kgf m, 28.5 lbf·ft) : 78 N m (8 kgf m, 57.5 lbf·ft) 10. Connect hose (30) between steering pilot valve (28) and hydraulic oil tank (15).

Secure clamps (31) (4 used) to the frame with sems bolts (29) (4 used). : 27 mm To Rear Axle 36 39 37, 38 W4GB-02-01-008 15 : 17 mm : 24.5 N m (2.5 kgf m, 18 lbf·ft) : 22 mm : 39 N m (4 kgf m, 28.5 lbf·ft) Front : 27 mm 29 30 31 : 78 N m (8 kgf m, 57.5 lbf·ft) 25 29 Charging Block W4GB-02-01-007 29 W2-1-8