Hitachi Construction Machinery — Removal and Installation of Hydraulic Oil Tank

BODY (UPPERSTRUCTURE) / Hydraulic Oil Tank 13. Connect wire harness (25) to hydraulic oil tank (5) with bolts (22) (8 used) and clamps (21) (8 used). : 20 N m (2 kgf m, 14.5 lbf·ft) 14. Connect the connectors of level sensor (24) and hydraulic oil temperature sensor (23). 15. Install the left and right side fenders. : 12 mm : 17 mm : 50 N m (5.1 kgf m, 36 lbf·ft) 16. Install the hood. (Refer to W2-4-1.) W4GB-02-03-017 W2-5-8 5 21, 22 24 3 2 3 25 21, 22 21, 22