CNH T8000 — INSTRUMENTATION DISPLAY SYMPTOM BASED FAULTS

Section 55 - Electrical System, Controller - Chapter 6 STEP 5 - Check power at fuse 37 With the key switch on and the display not illuminate. Remove fuse 37 and check for 12 volts. -- OK - Go to Step 7. -- NOT OK - Go to Step 6. STEP 6 - Check controller relay (TMF/ICU controller relay #19) The controller relay (#19) is located in the fuse compartment behind the operator seat. Check relay ground supply wire. Turn key on. Check for power at Controller relay (#19) base. Remove relay and check for power at C255 terminal 2 and 3. -- OK - Replace relay. -- NOT OK - Failed wire 160 to ignition switch, or wire 102 to ring terminal 138.

STEP 7 - Check power and ground supply to the instrumentation controller (Instrument Cluster). Install fuse 37. Remove the instrumentation controller. Turn the key on. Check connector CN2, pin 2 for 12 volts. -- NOT OK - Replace the wire between fuse 37 and the instrumentation controller connector CN2, pin 2. -- OK - Go to Step 8. STEP 8 - Check the ground supply at connector CN2, pin 4 Check the ground supply at connector CN2, pin 4. -- OK - Replace the instrumentation controller. -- NOT OK - Correct grounding problem. NOTE: If the problem is intermittent, one of the relays is starting to fail or has dirty contacts. 1 2 RI05G040 Fuse/relay compartment (behind operator seat) 1.

TMF/ICU RELAY (#19) 2. CAB POWER RELAY 55-6-18