Freightliner — Freightliner Business Class M2 Workshop Manual (EN)

Threaded Fasteners 00.04 General Instructions NOTE: Follow the safety precautions given on the locking compound container. 1. Clean the male and female threads of the fasten- ers, removing all dirt, oil, and other foreign mate- rial. If parts are contaminated, use Stoddard sol- vent for cleaning; then allow the fasteners to air dry for 10 minutes. Be sure solvent is completely gone before applying adhesive. 2. Transfer a small amount of the locking com- pound from the container to a paper cup or small non-metal dish. 3.

Using a plastic brush (a metal brush will contami- nate the compound), apply a small amount of compound to the entire circumference of three or four of the male threads that will be covered by the nut after it has been tightened. Be sure enough compound is applied to fill the inside of the nut threads, with a slight excess. 4. Install and torque the nut. Readjustment of the nut position is not possible after installation is complete, without destroying the locking effect. NOTE: To disassemble the fasteners, heat the bond line to 400°F (200°C) before removing the nut. Every time the fasteners are disassembled, replace them. If any parts are damaged by over- heating, replace the parts.

Business Class M2 Workshop Manual, Supplement 0, January 2002 100/2