hitachi — BAIC Hydraulic System Service Manual PDF - HX300L Technical Guide (EN)

3. COMBINED SWING AND ARM OPERATION ARM CYLINDER BUCKET CYLINDER BOOM CYLINDER TRAVEL MOTOR P5 P4 Pi2 Rs MU Pi1 Pn1 Pn2 SWING MOTOR PBa PAb1 P02 P04 PDb2 A2 PUMP A1 PUMP PILOT PUMP HYDRAULIC TANK 330S3HC19 When the swing and arm functions are operated, simultaneously the swing spool and arm spools in the main control valve are moved to the functional position by the pilot oil pressure from the remote control valve. The oil from the A1 pump flows into the swing motor through swing spool and the arm cylinder through arm 1 spool. The oil from the A2 pump flows into the arm cylinder through the arm 2 spool of the right control valve. The upper structure swings and the arm is operated.

Refer to page 2-51 for the swing operation preference function. 3-26 BC1 N RV2 Cck DR9 Co P05 Do PCo PDo OPTION Ca Da BC2 NRV1 Cco CoR AkR LCk1 LCk2 DoR LCo CaR DaR BUCKET BbkR PBa PCa PDa PAa2 P P DR7 CRa PaL ARM1 LCa LCa2 ARM2 PAa2 DR6 Csp Db2 BOOM2 Ccb SWING P/R LCar LCbk BbR ARM REGEN P02 Abk PBrc PAbk DR4 Cs Ds PCs PDs DR5 SWING P03 DR3 Ctl Dtl PCtl PDtl SH Patt ( TR RIG AVH ET L) PS DR1 P01 PtrPS TS Cs Ds PCs PDs DR5 SWING LCs AbR LCb CRb BOOM1 P03 DR3 Ctl Dtl PCtl PDtl Patt (RIGHT) TRAVEL DR1 BtR AtR (LEFT) TRAVEL MRV