DISASSEMBLY AND ASSEMBLY FUEL INJECTION PUMP ASSEMBLY 12 15. Remove sound absorbing material (18). Install the fuel injection pump assembly in the follow- ing manner. 16. Remove four nuts (19) to remove fuel injection pump assembly (20). 1) Check that the timing pin is properly adjusted to the fuel injection timing. Refer to Step 10 in the previous procedure, REMOVAL. 2) Remove plug (21), then reverse timing pin (22) of the fuel injection pump and assemble the plug to the pump again. Check that the cutout portion on the timing pin is engaged with protrusion a inside the pump.
Refer to the Inspection and Adjustment of Fuel Injection Timing section of the TEST- ING AND ADJUSTING, chapter in this manual. INSTALLATION Install in reverse order of removal. Air intake hose clamp: 5.4 - 6.4 Nm (0.55 - 0.65 kgm) Hose clamp: 2.84 - 3.82 Nm (0.29 - 0.39 kgm) Joint bolt: 19.6 - 29.4 Nm (2.0 - 3.0 kgm) 3) Mount fuel injection pump assembly (20) and secure it with four nuts (19). Nut: 9.8 ± 2 Nm (1.0 ± 0.2 kgm) Sleeve nut: 24 ± 4 Nm (2.45 ± 0.41 kgm) Adjust the governor lever stroke, refer to the Spe- cial Function of Monitor Panel section in the INSPECTION AND ADJUSTMENT chapter, of this manual. Nut: 95 ± 10 Nm (9.7 ± 1.0 kgm) 30-10 PC210/240-7K