DISASSEMBLY AND ASSEMBLY FINAL DRIVE ASSEMBLY 5. No.1 sun gear shaft Remove No. 1 sun gear shaft (11). 2) Disassemble No. 2 carrier assembly as follows. i) Push in pin (17) and pull out shaft (18) from carrier (19). After removing the shaft, remove pin (17). ii) Remove thrust washer (20), gear (21), bear- ing (22), and thrust washer (23). 6. Ring gear Remove ring gear (12). 7. Thrust washer Remove thrust washer (13). 8. No. 2 sun gear Remove No. 2 sun gear (14). 11. Nut 1) Remove lock plate (24). 9. Thrust washer Remove thrust washer (15). 2) Use tool F1 and remove nut (25). 10. No. 2 carrier assembly 1) Remove No. 2 carrier assembly (16) 30-34 PC210/240-7K