.
FOREWORD CONTENTS 1 - 10 DOOR OPEN LOCK INTERMEDIATE LOCK CK T SASH GLASS INTERMEDIA CAP WITH LO DOOR POCKE ASHTRAY TOOL BOX IOR OF CAB , HANDLING NER, HANDLING CLEAN INTER CAR STEREO AIR CONDITIO NER, HANDLING OPERATION RE STARTING ENGINE, ADJUST GINE AND CHECKS AFTER STARTING ENGINE GINE HINE ACHINE AR TWEEN FORWARD AND REVERSE ACHINE S FOR OPERATION CHINE R STOPPING ENGINE R FINISHING WORK CHECK BEFO STARTING EN OPERATIONS AND CHECK STOPPING EN MOVING MAC STOPPING M SHIFTING GE SHIFTING BE STEERING M PRECAUTION S FOR OPERATION PARKING MA CHECK AFTE R STOPPING ENGINE CHECK AFTE R FINISHING WORK LOCKING BLE USING BULLDOZER SE OF MODE SELECTION SYSTEM ATION METHOD FOR RIPPING OPERATIONS OSTURE OF WORK EQUIPMENT NGER UNDERCARRIAGE LIFE ON TION PROCEDURE LOADING WORK LIFTING MACHINE N ROADS CAB N OF CAB N OF ROPS R OPERATION S FOR LOW TEMPERATURE LETION OF WORK WEATHER ORAGE RAGE RAGE AGE CHINE AFTER LONG-TERM STORAGE TING ING OUT OF FUEL TOWING MACHINE WORK POSSI ULLDOZE EFFECTIVE U SE OF MODE SELECTION RIPPER OPER OPERATING METHOD FOR RIPPING OPERATIONS ADJUSTING P OSTURE OF WORK EQUIPMENT TIPS FOR LO NGER UNDERCARRIAG TRANSPORTATI TRANSPORTA LOADING, UN LOADING WORK METHOD OF TRAVELING O REMOVAL OF INSTALLATIO INSTALLATIO COLD WEATHE R OPERATIO PRECAUTION S FOR LOW TEMPERATURE AFTER COMP LETION OF W AFTER COLD LONG-TERM ST BEFORE STO DURING STO AFTER STOR STARTING MA CHINE AFTE R LONG-TERM STORAGE TROUBLESHOO AFTER RUNN ING OUT OF METHOD OF TOWING MACHINE 3 - 59 3 - 59 3 - 60 3 - 61 3 - 62 3 - 62 3 - 62 3 - 63 3 - 72 3 - 89 3 - 89 3 - 110 3 - 118 3 - 121 3 - 122 3 - 124 3 - 125 3 - 130 3 - 132 3 - 134 3 - 137 3 - 138 3 - 139 3 - 139 3 - 140 3 - 142 3 - 147 3 - 150 3 - 155 3 - 158 3 - 160 3 - 160 3 - 160 3 - 163 3 - 164 3 - 165 3 - 168 3 - 169 3 - 170 3 - 170 3 - 172 3 - 172 3 - 173 3 - 173 3 - 173 3 - 173 3 - 173 3 - 174 3 - 174 3 - 174 TARTING ENGINE AND REVERS