Komatsu — LIFTING UP CHASSIS ASSEMBLY

3 HD325, 405-6 Order of work Work procedure 1. Prepare 2 cranes. 2. Install slings to the points shown in the fig- ure and lift up the chassis assembly. 3. Remove the stands 4. Lower the chassis assembly. • Work on a level and firm place. • Weight of chassis assembly: Approx. 18 tons When using mobile cranes • Front side: 45 tons • Rear side: 25 tons • Protect the front bumper. • Take care that the rear side will not interfere with the grease tubes, etc. • Secure the left front suspension cylinder with wires so that it will not be extended by its weight. • Place supports higher than 800 mm under the parts to which the stands were installed. (3 layers of a block 300 mm square, etc.)