OPERATIONAL PERFORMANCE TEST / Standard T4-2-3 Performance Test Performance Standard Remarks Reference Page CONTROL LEVER STROKE mm Hitachi lever pattern T4-4-15 Boom Lever 97±10 Arm Lever (ISO Lever Pattern: Swing Lever) 82±10 Bucket Lever 82±10 Swing Lever (ISO Lever Pattern: Arm Lever) 97±10 Travel Lever 120±10 BOOM RAISE/SWING COMBINED sec OPERATION CHECK 5.0 or less Backhoe: 3.4 m Arm 1.9 m3 (PCSA heaped) Bucket, Bucket empty T4-4-16 Bucket Teeth Height: H mm 7000 or more COMPONENT TEST PRIMARY PILOT PRESSURE MPa (kgf/cm2) T4-5-1 Engine: Slow Idle 3.9+0.7 −0.2 (40+7.0 ) −2.0 Engine:
Fast Idle 3.9±0.2 (39±2) SECONDARY PILOT PRESSURE MPa (kgf/cm2) 3.4 to 4.0 (34 to 40) Value indicated on Dr. ZX (Lever: Full Stroke) T4-5-3 SOLENOID VALVE SET PRESSURE MPa (kgf/cm2) ±0.2 (2) Value indicated on Dr. ZX T4-5-4 MAIN RELIEF VALVE SET PRESSURE MPa (kgf/cm2) T4-5-8 Backhoe When each Boom Lower, Arm, Bucket Relief Operation 31.9+1.0 −1.5 (325+10 ) −15 When Power Digging 34.3+1.0 −1.5 (350+10 ) −15 RELIEF PRESSURE MPa (kgf/cm2) Backhoe When relieving swing 28.4+2.0 (290+20) When relieving travel 34.3+1.0 −1.5 (350+10 ) −15