BAIC — BAIC Comanche Service Manual: Comprehensive Guide for PA-24 Series Aircraft (EN)

PIPER COMANCHE SERVICE MASt" AL LIST OF ILLl1STRA TlO'S (cont.) figure Aerofichc Grid '0, 7-~. 7-5. 7-fl. 7-fla. 7-7. 7-H. 7-9. 7-10. 7-11, 7-1 ~. 7-13. 7-14, 7-15. 7-1 ft. 7-17. 7A-I, Woodward Propeller Governor Adjustment Points . Hartzell Propeller Governor Adjustment Points . Engine Installation (PA-24-IXO) . Cockpit Control Spring Back . Carburetor . Magneto Inspection . Lead Positioning . Impulse Coupling . Magneto Timing Marks . Timing Pointer . Timing Plate Installed on Breaker Compartment . Breaker Compartment With Cast Timing Marks . Engine Timing Marks . Ignition System Retard Breaker Magneto Installation . Removing Seized Spark Plug . Propeller Installation (McCauley) PA-24-250 .

Typical 'ick~ and Removal Method . Propeller Installation (Hartzell] PA-24-250 . Propeller Installation (Hartzell] PA-24-260 . Woodward Propeller Governor Adjustment Points . Hartzell Propeller Governor Adjustment Points . Engine Installation PA-24-250 . Engine Installation PA-14-160. Serial 'as. 24-4000 to 244782 inel. and :2A~' 2A2~ 2BI 2B5 :2 Bl' ~Bf, 2B9 ~B9 28 In 2810 2811 2B \I 2B 12 2B 15 281'" 2C7 2el 2CIO 2('12 2C If, :2CI7 2C21 7A-~. 7A-4. 7A-5. 7/,\-(,. 7A- -:. 7A-~. 7A-9, 7A-IO. 7A-II. 2~-~7x~ to 24-~I incl. . Engine Installation PA-24-2flO. Serial 'os. 24-4783 and 24-4804 and up . Carburetor . Schematic Diagram of RSA Fuel Injector System (PA-24-250 & PA-24-260) .

Idle and Mixture Adjustment (Fuel Injector) . Fuel Air Bleed 'OllIe . Magneto Inspection _ . Lead Positioning . Impulse Coupling . Magneto Timing Marks . Timing Pointer . Timing Plate Installed on Breaker Compartment ' . Breaker Compartment with Cast Timing Marks . Engine Timing Marks , Ignition System Retard Breaker Magneto Installation . Removing Seized Spark Plugs . Propeller Installation . Typical 'icks and Removal Methods . Propeller Governor Adjustment Points . Engine Installation (PAp:24-400l . Schematic Diagram of RSA Fuel Injector System (PA-14-400l . ~DI 20 7 2DII 2014 2016 2DI7 1DI9 7A-I~. 7A-I~. 7.'\-14. 7A-15. 7A-lh. 7A-li. 7A-IX, 7A-19 1 A-20. 7 A-~ I. 7 A-~2. 7 A-~). 7B-1.

7B-1. 7B-J. 78-4. 7B-5. 2020 2020 ~011 2D21 ~D22 2D24 2E2 2E4 1E22 1E2J 2D2~ 2F1 1FJ '~FX lAS Revised: It /1/82