DISASSEMBLY AND ASSEMBLY GENERAL 2) Install connection (3). 3) Install turbocharger lubrication tube (2). 4) Install spill tube (1). 37. Fuel injection pump 1) Install fuel injection pump ASSEMBLY (2) aligning it with the spline of the coupling. * When installing the injection pump, align stamped line ‘a’ on the flange and line ‘b’ on the flange of the injection pump. * If the lines are not stamped or the injection pump is being replaced, adjust the injection timing by the “Delivery method.” 2) Install the gasket, (1). then install lubrication tube | 38. After-cooler and intake manifold assembly 1) 2) Install the gasket.
Install the gasket, then lift and install the after- coolerand intake manifold assembly (1) as a unit. Ger] Intake manifold mounting bolt: 6.5 + 1.0 kgm we 39. Turbocharger and exhaust manifold assembly Install the gasket, then lift and install the turbocharger and exhaust manifold assembly as a unit. 4% Exhaust manifold mounting bolt: : #)_\= 10.5 + 1.0 kgm Exhaust manifold mounting bolt: Anti-seizing compound 170-1 SERIES (EP-5) Si62P 1 12)